|
1.
|
|
THE PAVEMENT'S SURFACE TEMPERATURE AT 135° AND ITS BOTTOM TEMPERATURE AT 100° CAUSES
PAVEMENT TENSION.
|
|
2.
|
|
THE SURFACE OF THE PAVEMENT EXPANDS AND CONTRACTS GREATER THAT THE BOTTOM, CAUSING THE CRACK TO
PENETRATE DOWNWARD.
(Chack sealant should be applied at this stage)
|
|
3.
|
|
IF SEALANT IS NOT APPLIED, WATER PENETRATION OCCURS, THE BASE IS SOFTENED AND THE PAVEMENT LOSES
ITS SUPPORT.
|
|
4.
|
|
VEHICLE LOAD COMPRESSES ASPHALT DOWNWARD CAUSING WATER EROSION TO THE BASE.
|
|
5.
|
|
LOAD CHANGE INCREASES THE EROSION PROCESS.
|
|
6.
|
|
EROSION AND WATER EVAPORATION STRIP AWAY SUPPORT FROM UNDERNEATH THE PAVEMENT; THIS CAUSES STRESS
POINTS.
|
|
7.
|
|
LOAD BEARING VEHICLES STRESS THE PAVEMENT BEYOND ITS CAPACITY, WHICH CAUSES ASPHALT FAILURE OR
"ALLIGATORING".
|
|
8.
|
|
CRACK SEALING SHOULD TAKE PLACE AT STAGE 2, BEFORE WATER PENETRATION CAN OCCUR.
|
|
9.
|
|
ROADWORKS #306 RUBBER SEALANT IS RECOMMENDED FOR CRACKS CAUSED BY THERMAL STRESS.
|